UNITECHHydropower

Our Projects

Operational project

Upper Phawa Khola (5.8 MW)

Upper Phawa Khola — project site and headworks
Upper Phawa Khola — operational detail

FACT SHEET

  • CAPACITY5.8 MW
  • CODBS 2081/01/08
  • TURBINE2 × Pelton

Location

Taplejung District, Nepal — Pathivara Yangbarak, Dumrise Shrijangha, and Sikaicha (per company disclosures).

Transmission line

8 km, 33 kV

Connectivity

Amarpur Substation

National contribution

5.8 MW

In pipeline

Middle Iwa Khola (15 MW)

Middle Iwa Khola — project landscape and infrastructure
Middle Iwa Khola — feasibility-stage engineering context

FACT SHEET

  • CAPACITY15 MW
  • OWNERSHIP51%
  • TRANSMISSION~22 km, 132 kV

Location

Taplejung and Panchthar (per company disclosures).

Gross head

400.10 m

Design discharge

4.36 m³/s

First-year revenue (est.)

NPR 51.15 Cr