Operational project
Upper Phawa Khola (5.8 MW)


FACT SHEET
- CAPACITY5.8 MW
- CODBS 2081/01/08
- TURBINE2 × Pelton
Location
Taplejung District, Nepal — Pathivara Yangbarak, Dumrise Shrijangha, and Sikaicha (per company disclosures).
Transmission line
8 km, 33 kV
Connectivity
Amarpur Substation
National contribution
5.8 MW
In pipeline
Middle Iwa Khola (15 MW)
FACT SHEET
- CAPACITY15 MW
- OWNERSHIP51%
- TRANSMISSION~22 km, 132 kV
Location
Taplejung and Panchthar (per company disclosures).
Gross head
400.10 m
Design discharge
4.36 m³/s
First-year revenue (est.)
NPR 51.15 Cr